Greene Home Redesign llc craft · integrity · structure
project site: mill 19
est. completion: Q4
crew: 12
structural

Riverbend steel frame

42' span 28 ton

Erected IPE 400 & custom trusses. Welded on site.

details
concrete

Warehouse foundation

120y³ 6d pour

Rebar cages & high-early strength mix. Curing underway.

pour log
framing

East elevation infill

2x6 / LVL weather wrap

Advanced framing with ZIP sheathing. Air barrier taped.

inspection
masonry

Retaining wall & veneer

2,400 brick week 4

Reclaimed face brick with through-wall flashing.

samples

⌘ WIP general notes

A.W.S. D1.1 / D1.8 structural welds

concrete 28d break: 4,500 psi

all LVL to manufacturer specs

anchor bolt torque: 90ft·lb

daily safety: harness / lanyard inspection

  • total sqft: 17,200
  • electrical rough: 70%
  • plumbing rough: 45%
  • weather days: 3
  • RFIs: 8 closed

next walk: wed 8:00 am (superintendent)

on-site crew

Mac Wyman

general foreman

J. Reyes

carpentry lead

L. Novak

welding / steel

D. Ko

equipment op.